Skip to content

    Do I need a shed permit in Colorado Springs?

    The short answer

    Pikes Peak Regional Building Department exempts a one-story detached accessory building up to 200 square feet with no plumbing or permanent electric. Above 200 sq ft you need a permit, and city zoning setbacks and height limits apply either way. Every step, fee, and form is in our Colorado Springs shed permit guide.

    In Colorado Springs, building permits go through Pikes Peak Regional Building Department (PPRBD), while setbacks, height, and lot coverage are enforced by city zoning. Those are two separate reviews, and a shed can be exempt from one and still restricted by the other.

    • Up to 200 sq ft — generally exempt from a building permit if it is one story, has no plumbing, and no permanent wiring.
    • Over 200 sq ft — a building permit with a site plan is required.
    • Any electrical or plumbing — a permit is required regardless of size.
    • Setbacks and height still apply to every shed, permit or not.

    Snow load matters here

    El Paso County design snow loads mean roof framing is not optional detail work. Our buildings are framed and rated for Colorado ground snow loads, and we can supply the numbers for your permit packet.

    We walked through the whole process — exemption thresholds, zoning setbacks, fees, and timelines — in our Colorado Springs shed permit guide, which is the fastest way to see what your specific lot will require.

    Sources & references

    Local codes change. Always confirm current requirements with your city or county before ordering.

    Local | Family Owned | Trusted

    Ready to price out your structure?

    Configure your exact building in 3D and see pricing instantly, or talk it through with our Colorado team.