
Adding a storage shed in Fremont County means checking two things: whether the shed needs a permit, and whether your parcel's zoning allows it where you want it. The answer depends on the shed's size and intended use, whether the property is inside an incorporated town or city, its zoning district, foundation and site conditions, and floodplain mapping.
This guide is based on Fremont County's published building code and permitting resources. Official requirements are labeled separately from The Shed Yard's recommendations.
Short answer: Fremont County's adopted building code exempts one-story detached tool and storage sheds, playhouses and similar structures of 200 square feet or less from a building permit (Section 105.2, Resolution 60, Series 2020). That is a building-permit exemption, not permission to ignore zoning, setbacks, floodplain rules or other regulations. Larger sheds generally need a permit.
Verify your parcel before you buy. Confirm who has jurisdiction, your zoning district and your setbacks before you order or place your shed.
Fremont County Shed Permit Requirements
The Fremont County Building Department serves unincorporated Fremont County. Properties within the incorporated limits of Cañon City, Florence, Williamsburg, Rockvale, Coal Creek or Brookside must contact that municipality's building department instead. A mailing address does not establish jurisdiction; a Cañon City or Florence address can still be an unincorporated county parcel.
- Fremont County Building Department: (719) 276-7460, 615 Macon Avenue, Room 212, Cañon City, CO 81212. Monday–Thursday, 7:00 AM–5:00 PM, excluding holidays.
- Fremont County Planning and Zoning: (719) 276-7360, 615 Macon Avenue, Room 210, Cañon City, CO 81212, for zoning questions on county parcels.
Planning a shed for a property in or near Cañon City? Start by confirming whether your parcel is inside city limits, because that decides which building department reviews it.
When Does a Shed Require a Permit?
| Shed size | Floor area | Building-permit starting point |
|---|---|---|
| 8x10 storage shed | 80 sq. ft. | Exempt if qualifying conditions are met |
| 10x12 storage shed | 120 sq. ft. | Exempt if qualifying conditions are met |
| 10x20 storage shed | 200 sq. ft. | At the exemption limit |
| 12x20 storage shed | 240 sq. ft. | Building permit generally required |
| 12x24 Studio Shed | 288 sq. ft. | Building permit generally required |
| 12x40 storage shed | 480 sq. ft. | Building permit generally required |
Under Section 105.2, one-story detached accessory structures used as tool and storage sheds, playhouses and similar uses are exempt from building permits when the floor area does not exceed 200 square feet. Keep in mind:
- The shed must fit the stated use and be one story and detached.
- A two-story shed does not qualify for this exemption.
- A shed over 200 square feet generally requires a building permit.
- Electrical work may require a separate permit.
- The code states that exemptions do not authorize work that violates the building code or other county, state or federal laws, so exemption does not establish zoning compliance.

Fremont County Shed Zoning and Setback Requirements
A building-permit exemption does not remove zoning requirements. For county parcels, the Fremont County Zoning Regulations govern things like:
- Front, side and rear setbacks for your shed
- Shed placement and permitted accessory uses
- Maximum shed height and lot coverage
- Property boundaries, road rights-of-way and easements
- Differences between zoning districts
- Special review requirements, where they apply
There is no universal shed setback for all of Fremont County. Setbacks depend on the zoning district and applicable development standards, and your shed must stay outside required setbacks. Confirm your zoning district and setbacks with Planning and Zoning at (719) 276-7360 before choosing a location, and check that you are reading the current version of the regulations. On smaller in-town lots, such as many in Florence, placement is often the deciding factor, so get the municipality's setbacks before you pick a shed size.
Shed Foundation Requirements
Shed foundation requirements depend on the structure, its size and use, site conditions and the applicable code. Fremont County's adopted amendments include two provisions worth knowing:
- Footings: the county amended Section R403.1 to state that all footings shall be designed and certified by a Colorado-licensed architect or engineer.
- Soils: under R401.4, where data indicate expansive, compressible, shifting or otherwise questionable soils are likely, the building official may require a soils investigation or recommendations from a Colorado-licensed engineer.
The county does not publish a single slab depth, frost depth or engineering threshold for every shed, so confirm foundation requirements before ordering. Our recommendation: a level gravel pad can suit many qualifying storage sheds, but it is not automatically acceptable for every permitted shed. Larger or site-specific shed designs may require certified footings. Compare options in our shed foundation guide, and see our site preparation services for gravel pads and concrete shed foundations.
Get the Most Up-to-Date Pricing
Prices shown are current as of Sep 2026 and can change at any time. Options, site prep, permits, and delivery conditions all affect the final cost.
Shed Floodplain and Additional Property Considerations
Properties near the Arkansas River, creeks, drainage channels and other flood-prone areas may face added development requirements. Not every property near water needs a floodplain permit; it depends on the mapped flood zone and the proposed shed placement. Check your parcel on the FEMA Flood Map Service Center, and see the county's Flood Damage Prevention Permit Application if your parcel is mapped.
- Utility easements
- Septic systems and required clearances
- Wells
- Access and shed delivery conditions
- Existing structures and property improvements
Evaluate shed site preparation and delivery before ordering. See our shed delivery guide and site preparation services.
What We Learned from Fremont County's Published Documents
The table below is based only on Fremont County's published documentation, reviewed November 2026. It does not reflect conversations with county staff. We will add verified notes from direct conversations with the county here as we obtain them.
| Shed topic | Published information | Additional confirmation |
|---|---|---|
| Small storage sheds | One-story detached structures up to 200 sq. ft. may be exempt | Confirm zoning and site compliance |
| Larger sheds | Generally require a building permit | Confirm applicable submittal requirements |
| Shed foundation | Footings must be designed and certified by a Colorado-licensed architect or engineer | Confirm foundation requirements for the proposed shed |
| Shed zoning | District-specific regulations apply | Confirm setbacks, height and permitted use |
| Floodplain | Flood damage prevention permit application published | Check the actual parcel and proposed shed placement |
How to Get a Shed Permit in Fremont County
- 1. Confirm jurisdiction. Unincorporated Fremont County or an incorporated municipality?
- 2. Check zoning. Identify your zoning district and confirm the shed is an allowed accessory use.
- 3. Define the shed. Footprint, height, intended use and foundation type.
- 4. Check the site. Required setbacks, lot coverage and floodplain conditions.
- 5. Check the exemption. Does the shed qualify for the 200-square-foot building-permit exemption?
- 6. Get the right checklist. If a permit is required, obtain the shed application and submittal information.
- 7. Prepare documents. Plot plan, shed drawings, foundation documentation and anything else required.
- 8. Submit. File with the jurisdiction that governs your parcel.
- 9. Complete inspections. Finish required inspections and approvals before considering the project complete.
Let The Shed Yard Handle Your Shed Permitting
Our Turn-Key permitting service can handle the parcel investigation, drawings and truss documentation, permit filing, and coordination through final inspection. Tell us your address and shed plans so we can confirm the scope and quote your project. Your county or city makes the final approval decision.
Rather Not Handle the Shed Permitting Yourself?
The Shed Yard can help coordinate the process. Depending on your project, our Fremont County shed permitting help can include property and zoning investigation, shed drawings and building documentation, truss certifications, permit application preparation and submission, concrete foundation work, and coordination through required inspections. We assist with the process; the county or city retains authority over approval. Learn more about The Shed Yard's permitting services.
Talk to Our Shed Permitting Team
Send us your address and shed plans and we'll confirm what your parcel needs and what we can handle.
Serving Fremont County Shed Owners
The Shed Yard is based in Penrose and delivers and installs sheds throughout Fremont County, including Cañon City, Penrose, Florence and surrounding communities, with in-house shed permitting help, site preparation, and local delivery and installation. Ready to plan? Design your custom shed in our 3D designer or contact our team.
Fremont County Shed Permit FAQs
Official Sources
- Fremont County Building Department
- Fremont County Applications and Submittal Information
- Fremont County Building Code, Resolution 60, Series 2020
- Fremont County Zoning Regulations
- FEMA Flood Map Service Center
Requirements can change. This guide reflects Fremont County documents reviewed November 23, 2026. Resolution 60, Series 2020 adopted the 2018 International Codes effective January 1, 2021; newer amendments may have been adopted since, so confirm current requirements with the county or your municipality. This is general shed planning information, not a ruling for your property. The Shed Yard is not the permitting authority and cannot guarantee approval.
Building a shed elsewhere? See our Colorado shed permit requirements by county or the El Paso County shed permit requirements.

Written by the team at The Shed Yard — family owned, Colorado built. We handle the building, the site prep, and the permits, start to finish.